OFFICIAL MINUTES

Village Council Meeting

VILLAGE OF MENDON

206 W Main St, Mendon, MI 49072

September 21st, 2026

 

The Mendon Village Council met on Monday, September 21st, 2026, in the Municipal Center. President Olson called the meeting to order at 6:03 P.M. Answering roll call: Saunders, Leo, Batten, Watson. Absent: Jacki Coburn, Clerk Lane. Police Chief Kline was present at the meeting, along with Manager Hill.

 

 

6:03 p.m. – Meeting Called to Order

 

Pledge of Allegiance and roll call.

 

6:03 p.m. – Call to the Public

Resident concerns included weeds and debris at the corner of East and Jackson, damaged swing equipment at Water Tower Park, compost-site access, and scrap-metal disposal.

Manager Hill advised that they have to have DPW investigate the swing set. That the compost site is available near the transfer station and residents will need to contact the village hall or DPW for access, and it is to remain locked to avoid any dumping of garbage.

 

6:03 p.m. – Approval of Agenda

 

Motion by Don Saunders and supported by Mike Leo to approve the agenda.

MOTION CARRIED
Aye (5), Nay (0), Absent (0)

 

 

 

 

6:05 p.m. – August 17th, 2026, Meeting Minutes

Motion by Saunders and supported by Batten to approve the August 17th, 2026, Meeting Minutes.

MOTION CARRIED
Aye (5) Nay (0) Absent (0)

 

 

Staff Reports

Clerk

Manager Hill reported work on the audit, submission of tax information to the county, and preparations for a cloud-based municipal software transition. Potential functions included online payments, automatic payments, and emailed bills. Members raised concerns about publicly accessible customer information and payment fees. A county-coordinated vendor meeting was discussed for the following month. No software purchase or fee structure was approved during this discussion.

Treasurer

Manager Hill described an upcoming water-system review and walkthrough with the state environmental agency. A galvanized-service inventory had been located.

Denis advised we were awaiting sampling results while investigating metal contamination in lagoon sludge. Engineering drawings have been obtained to help identify additional sampling locations at a connected facility. Participants emphasized the need for evidence before determining the source or whether contamination was ongoing.

Manager

Manager Hill, the river-park boardwalk was described as deteriorating and in need of substantial replacement. Bids were outstanding. Manager Hill described a potential environmental grant for river vegetation removal. The council supported pursuing the opportunity and suggested possible township participation and community support.

 

 

DPW

This year’s street projects were reported complete, including work on North Railroad Street. A contractor labor invoice was expected.

 

Hydrant flushing was announced for October 15–17, including flushing sediment from the water tower. A hydrant replacement and Mill Street water-service work were projected for the Thursday following the meeting.

 

Two additional water services required outside equipment and labor. Discussion about metering and billing for a multi-unit property. Discussed was the direction to take on the older dump truck. The discussion included reliability, repair costs, insurance, backup availability, and compatibility of the new truck with the leaf vacuum.

 

Police

Mike Kline reported obtaining three radar units at no equipment cost, with functionality and installation being addressed. The report also covered coordination with fire personnel, elder-abuse training, public resource brochures, and investigation materials.

Kline was reviewing sample e-bike ordinances, including downtown sidewalk use, pedestrian safety, passengers, and bike classifications. A draft will be brought forward for council review.

 

Personnel Committee

No update

Finance Committee

No updates

Fire Board

Watson advised a busy month for the fire department and discussed a dispatch change concerning routine medical calls and possible assistance when requested. The precise operational scope should be confirmed with the fire chief.

Planning Commission

No update

 

DDA

Cindy advised Harvest Fest was announced for October 17, 4–7 p.m., at the park, with a possible movie afterward depending on the weather. The joint DDA–council meeting was announced for October 26 at 5 p.m.

SJAC—No Update

 

6:17 p.m. – Public Hearing

None

 

6:18 – Unfinished Business:  

  1. Water Project Update

Olson advised that Pay application 5 needed to be paid IAO $1,577.50.

Motion by Watson and supported by Saunders to approve and pay pay-application 5.

MOTION CARRIED
Aye (5) Nay (0) Absent (0)

 

  1. Sidewalks – Repair

Bids remained outstanding. Manager Hill would email the council when information became available.

Waiting on more bids. Tabled

 

  1. Proposal – Land Disposition

Olson discussed possible residential development on village land near the sewer lagoons, including a potential sale or donation and possible outside funding. The chair intended to bring the matter to the Planning Commission to assess partial rezoning and compatibility with the master plan.

 

 7:26 – New Business: 

  1. – Audit Update

 

Hill advised the audit was nearing completion, with September 30 discussed as the deadline. Hill would confirm whether the tax-increment-financing report was included in the auditor’s engagement. Act 51 reporting was also discussed.

 

  • MOTION CARRIED
    Aye (5), Nay (0), Absent (0)

 

  1. Planning Commission – Master Plan Amendments

 

Olson proposed updates to the future land-use map and zoning text. A staged approach could allow certain map changes to proceed before broader revisions, if compatible with the existing master plan. Potential residential and mixed-use changes were discussed.

Olson described comments, notification, and hearing steps and possibly a special council meeting. Estimated publication costs of approximately $300–$600 and mailing costs of approximately $400–$500 were discussed.

 

 

 

  1. Compost area Clean up.

 

Denis reported insufficient space for leaf disposal and equipment maneuvering. A contractor proposal to clean the area was discussed. He advised the cost would be around $2,000.

 

 

Motion by Saunders and supported by Batten to approve up to $2,000.

 

 

  • MOTION CARRIED
    Aye (5), Nay (0), Absent (0)

 

 

 

7:38 – Consideration of Bills and Transfers:

 

Bills: $64,899.93

Motion by Saunders and supported by Leo to pay the monthly bills IAO $64,899.93

 

MOTION CARRIED
Aye (5) Nay (0) Absent (0)

 

7:39 p.m. – Meeting Adjourned